Final | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Brian Scoles
|
|
|
final ok- card signed
|
Final | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | PART |
Brian Scoles
|
|
|
final - call jeremy Phone #: ###-#### Inspection requested via web by Brandon Sorensen- need other mech permit frm different contractor called in for final before can final out this permit- final ok
|
Final | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PART |
Brian Scoles
|
|
|
final - call Jeremy Phone #: ###-#### Inspection requested via web by Brandon Sorensen- ok for ceiling tiles- Roof ok- units need fired up and air balance done
|
Rough-in | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Brian Scoles
|
|
|
cover inspection - ceiling Phone #: ###-#### Inspection requested via web by Brandon Sorensen- insulation ok on duct- ok to cover- will need Smoke Detectors both units by final
|
Rough-in | 1/23/2018 | 1/24/2018 | 1/24/2018 | A | PASS |
Brian Scoles
|
|
|
rough in - call jeremy Phone #: ###-#### Inspection requested via web by Brandon Sorensen- seal on duct ok- ok to insulate
|