Final | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- final on 4 units ok
|
Final | 5/2/2018 | 5/3/2018 | 5/3/2018 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak unit 101- lineset on indoor unit needs insulation and supported- needs duct blast and airbalance reports on site unit 102- lineset on indoor unit needs taped- fresh air in the mech room needs insulated- needs duct blast and air balance reports onsite unit 103- need duct blast and air balnce reports onsite unit 104- fresh air in mech room to insulated- need duct blast and air balance reports onsite
|
Final | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | NR |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- work needs to be done not ready for final
|
Rough-in | 1/24/2018 | 1/24/2018 | 1/24/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
Rough-in | 1/23/2018 | 1/24/2018 | 1/24/2018 | A | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak - Need approved manual J on site. Missing nail plates on dryer duct. Need to complete condensate piping
|