Final | 3/22/2018 | 3/23/2018 | 3/23/2018 | A | PASS |
Brian Scoles
|
|
|
Artem-please call for access code Phone #: ###-####- final ok
|
Rough-in | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by claude croy- R/I ok
|
Rough-in | 1/31/2018 | 2/1/2018 | 2/1/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by claude croy- crawl needs completed/ducts not hooked up- supply air in garage kinked/pinched pff to NE corner supply 2nd floor, need to be nice bends per manufacture install- left corretion notice front window- all else is good
|
Rough-in | 1/30/2018 | 1/30/2018 | 1/30/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by claude croy- need approved ACCCA report onsite to do inspection- b vent insulation shield needs 1" clearance to pipe
|
Pressure Test | 1/30/2018 | 1/30/2018 | 1/30/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by claude croy- 20lb gas pass
|