Final | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Jack Reynolds
|
|
|
Fritz Phone #: ###-####- range hood final ok
|
Final | 2/7/2018 | 2/8/2018 | 2/8/2018 | A | CANC |
Chad Schwendiman
|
|
|
The bathroom exhaust has been run. Door code is 0205. As early as possible, thank you. Phone #: ###-#### Inspection requested via web by fritz ramisch - This should have been scheduled as a rough in. I entered a rough in activity for it. Unable to final untill the range hood installation is complete.
|
Rough-in | 2/8/2018 | 2/8/2018 | 2/8/2018 | A | PASS |
Chad Schwendiman
|
|
|
The bathroom exhaust has been run. Door code is 0205. As early as possible, thank you. Phone #: ###-#### Inspection requested via web by fritz ramisch
|
Final | 2/5/2018 | 2/6/2018 | 2/6/2018 | P | FAIL |
Chad Schwendiman
|
|
|
Door code is 0205 if no one is there. Make up air issue Phone #: ###-#### Inspection requested via web by fritz ramisch - Corrections not made
|
Rough-in | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PART |
Chad Schwendiman
|
|
|
gas line and 8" range hood exhaust Phone #: ###-#### Inspection requested via web by fritz ramisch - 20lb gas pass. Need make up air for range hood, need to vent bath fan
|