Rough-in | 3/12/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Brian Scoles
|
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- should have been final
|
Final | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Brian Scoles
|
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- final ok- card signed
|
Pressure Test | 2/14/2018 | 2/15/2018 | 2/15/2018 | A | PASS |
Brian Scoles
|
|
|
AB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60lb gas pass whole system- need to walk roof at final
|
Pressure Test | 2/2/2018 | 2/5/2018 | 2/5/2018 | A | PASS |
Brian Scoles
|
|
|
ANDREW IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 20lb gas pass- need to walk roof at final
|