Final | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | PASS |
Ben Livingston
|
|
|
Call Josh 20 min ahead Thanks Phone #: ###-#### Inspection requested via web by Manuel Canto
|
Final | 6/22/2018 | 6/22/2018 | 6/22/2018 | A | CANC |
Ben Livingston
|
|
|
Call Josh from strite 20 min ahead to meet inspector Thanks Phone #: ###-#### Inspection requested via web by Manuel Canto canc. per manny
|
Rough-in | 2/18/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Ben Livingston
|
|
|
call many 20 min advance to meet inspector on jobsite and walk him thru Phone #: ###-#### Inspection requested via web by Manuel Canto
|
Pressure Test | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Ben Livingston
|
|
|
call many 20 min advance to meet inspector on jobsite and walk him thru Phone #: ###-#### Inspection requested via web by Manuel Canto 60,20lb gas, 5lb flue x2
|