Final | 4/30/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Jack Reynolds
|
|
|
AC: 1905 Phone #: ###-#### Inspection requested via web by Gary Reeves- final ok
|
Pressure Test | 2/16/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - 20lb gas
|
Rough-in | 2/16/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|
Rough-in | 2/14/2018 | 2/15/2018 | 2/15/2018 | A | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - Need approved manual J on site. Need a continous solid floor passage way thats 24" wide from attic access to equipment platform.
|
Pressure Test | 2/14/2018 | 2/15/2018 | 2/15/2018 | A | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - Gauge down below 20lbs
|