Final | 8/14/2018 | 8/14/2018 | 8/14/2018 | A | PASS |
Brian Scoles
|
|
|
final ok- card signed
|
Final | 8/3/2018 | 8/6/2018 | 8/6/2018 | P | PART |
Brian Scoles
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- need all gas piping secured- will look at this on other mech contractor final-
|
Pressure Test | 7/30/2018 | 7/31/2018 | 7/31/2018 | A | PASS |
Brian Scoles
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60lb gas pass whole system- need to secure gas piping on roof to supports by final
|
Rough-in | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | CANC |
Brian Scoles
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- will be looked at on plumbing side today PM
|
Pressure Test | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PART |
Brian Scoles
|
|
|
60lb gas test pass from meter to roof- ok to cover- will test whole system when completed
|
Pressure Test | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | FAIL |
Brian Scoles
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- gauge doesnt zero out- reschedule for pm today
|
Rough-in | 5/18/2018 | 5/21/2018 | 5/21/2018 | A | FAIL |
Brian Scoles
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- gauge at 49psi
|