Final | 3/28/2018 | 3/29/2018 | 3/29/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Xanti Berria-furnace/ac coil and CO okay
|
Pressure Test | 3/28/2018 | 3/29/2018 | 3/29/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Xanti Berria- 5lb flue pass
|
Final | 3/28/2018 | 3/28/2018 | 3/28/2018 | P | CANC |
Brian Scoles
|
|
|
Late PM around 3. Travis is the tech that will meet you there he will call you before heading over and see what time works best with your schedule. Phone #: ###-#### >> Inspection requested via web by Xanti Berria Inspection cancelled from web by: Xanti Berria
|
Pressure Test | 3/28/2018 | 3/28/2018 | 3/28/2018 | P | CANC |
Brian Scoles
|
|
|
Late PM around 3. Travis is the tech that will meet you there he will call you before heading over and see what time works best with your schedule. Phone #: ###-#### >> Inspection requested via web by Xanti Berria Inspection cancelled from web by: Xanti Berria
|
Final | 3/27/2018 | 3/28/2018 | 3/28/2018 | A | CANC |
Brian Scoles
|
|
|
Late AM. Please call when on way: Tyrel ###-#### Phone #: ###-#### >> Inspection requested via web by Krista Boss Inspection cancelled from web by: Xanti Berria
|