Final | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- air balance reports ok- final ok
|
Final | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | NR |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- not ready air balance was still being performed
|
Rough-in | 2/21/2018 | 2/21/2018 | 2/21/2018 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
Rough-in | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- need to finish allcondensate drains- unit 103 dryer vent at roof not attached
|