Final | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Brian Scoles
|
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- final ok
|
Rough-in | 2/22/2018 | 2/23/2018 | 2/23/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- R/I ok
|
Rough-in | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- duct in crawl needs supported 4" clearance to ground, laying on ground- boots all need mastic to floor- need to install boot in closet for conditioned crawl- need to fix all rips and tears in armaflex- left correction notice front window
|
Conference | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Brian Scoles
|
|
|
fireples Phone #: ###-#### Inspection requested via web by Oleg Chervak- fireplace R/I ok
|
Pressure Test | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass
|