Final | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- final ok
|
Rough-in | 3/2/2018 | 3/5/2018 | 3/5/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- R/I ok
|
Rough-in | 2/21/2018 | 2/22/2018 | 2/22/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- need csst approved nail plates installed on gas line- dryer vent needs fixed and leveled- framing needs completed around ducting- b vent at roof needs clearance to combustibles
|
Pressure Test | 2/21/2018 | 2/22/2018 | 2/22/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pass
|