Final | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Jack Reynolds
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 5x gas piping for shell and core ok- tagged ok
|
Pressure Test | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Jack Reynolds
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60lb gas pressure test 5x ok- tagged ok
|
Final | 9/19/2018 | 9/20/2018 | 9/20/2018 | P | DONE |
Jack Reynolds
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- crew had a few small leaks that they were working on- this inspection should have been a R/I pressure test- reinspect as a pressure test and final
|
Rough-in | 9/20/2018 | 9/20/2018 | 9/20/2018 | P | PASS |
Jack Reynolds
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- gas piping for shell and core R/I ok
|