Final | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Ben Livingston
|
|
|
Hydronic pressure test ; Final. If questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann 100lb test
|
Final | 4/26/2018 | 4/30/2018 | 4/30/2018 | A | FAIL |
Ben Livingston
|
|
|
Hydronic pressure test ; Final. If questions, please contact Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann test at 40lb
|
Rough-in | 3/15/2018 | 3/15/2018 | 3/15/2018 | P | FAIL |
Ben Livingston
|
|
|
If access is needed call Ken Story w/ St. Luke''s Construction ###-####. We were told the location will be open and unlocked. Any other questions please contact Donny @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann need city stamped plans on site for inspection
|
Rough-in | 3/12/2018 | 3/13/2018 | 3/13/2018 | A | NH |
Ben Livingston
|
|
|
if questions call Donny @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann all locked up no access
|