Final | 5/10/2018 | 5/11/2018 | 5/11/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino- final ok
|
Conference | 4/9/2018 | 4/12/2018 | 4/12/2018 | A | PASS |
Brian Scoles
|
|
|
w duct blast 930 am Phone #: ###-#### Inspection requested via web by dannyel chaloupka- duct blast test pass
|
Rough-in | 3/13/2018 | 3/13/2018 | 3/13/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- R/I ok
|
Rough-in | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- b vent in garage ceiling needs 1" clearance to combustibles, once sheetrock is installed wont have clearance- need to move to the south- missing transfer register in master bedroom 1st floor- left notice front window
|
Pressure Test | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 20lb gas pass
|