Final | 6/8/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Ben Livingston
|
|
|
Large remodel home, there may be possible contractors there but open to access. We are ready for final mech inspection for our scope of work, already passed rough in. I left Diamond Heating office number for contact and my name is Steve Dale. Phone #: ###-#### Inspection requested via web by Rick Montgomery
|
Final | 4/13/2018 | 4/16/2018 | 4/16/2018 | A | FAIL |
Ben Livingston
|
|
|
PLEASE CALL OUR LEAD INSTALLER BRAD WHEN 30 MINS IN ROUTE- LATER AM PREFERRED- 10A-12P Phone #: ###-#### Inspection requested via web by Rick Montgomery 2nd condensate line cannot tie into primary condensate line, gas piping to appliances need drip leg, gas piping in furnace room needs to be capped after shut off valve
|
Rough-in | 3/7/2018 | 3/8/2018 | 3/8/2018 | A | PASS |
Ben Livingston
|
|
|
Reinspection. No need to call ahead. Contractors onsite. Please contact Diamond with any questions. ###-####. Phone #: ###-#### Inspection requested via web by Rick Montgomery
|
Rough-in | 3/2/2018 | 3/2/2018 | 3/2/2018 | P | FAIL |
Ben Livingston
|
|
|
WE ARE CALLING FOR ROUGH IN INSPECTION. OPEN JOB SITE SO YOU CAN GO ANYTIME THIS AFTERNOON. I DID LEAVE MY OFFICE NUMBER FOR DIAMOND HEATING AND MY NAME IS STEVE IF YOU HAVE ANY FURTHER QUESTIONS. THANKS SO MUCH Phone #: ###-#### Inspection requested via web by Rick Montgomery dryer vent wall needs to be furred out, and nailplates at floor
|
Pressure Test | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Ben Livingston
|
|
|
please call our lead installer Brad when 30 mins in route- early afternoon requested please if possible- 12-2p Phone #: ###-#### Inspection requested via web by Rick Montgomery 20lb gas
|