Final | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Brian Scoles
|
|
|
bob Phone #: ###-####- New HVAC final ok
|
Final | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew BLANKENSHIP- need to resubmit manual J for furnace installed at residence- range hood does not meet manufactures minimum clearance for gas appiliances- need tp seal dryer duct where penetrates ion to box in laundry room
|
Rough-in | 3/5/2018 | 3/5/2018 | 3/5/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew BLANKENSHIP- R/I ok
|
Rough-in | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew BLANKENSHIP- need approved manual J onsite for inspection- need approved nail plates on csst piping- need to finish R/I flexs not hooked up- need to seal boots to floors-
|
Pressure Test | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Matthew BLANKENSHIP- 60lb gas pass- 20lb gas pass- 5lb pass
|