Final | 10/11/2018 | 10/11/2018 | 10/11/2018 | A | PASS |
Eric Strole
|
|
|
|
Mec-Request for Extension | 9/3/2018 | 9/4/2018 | 9/4/2018 | A | PASS |
Jack Reynolds
|
|
|
Hi - I need to extend my mechanical permit - probably a month out before I have the rest of the project is wrapped up. Right now the mechanical expires 9/10/18, my other permits don’t expire until October or later. Thanks! Phone #: ###-#### Inspection requested via web by Steve Hanchett - permit extension ok for homeowner
|
Rough-in | 5/5/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Jack Reynolds
|
|
|
Not sure if need a re-do of rough-in from 5-1? Between 12:45 and 2 pm Phone #: ###-#### Inspection requested via web by Steve Hanchett- rough in ok
|
Pressure Test | 5/5/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Jack Reynolds
|
|
|
Between 12:45 and 2 pm. Ready for pressure test for furnace flue vent Phone #: ###-#### Inspection requested via web by Steve Hanchett - 5lb flue test ok
|
Rough-in | 4/25/2018 | 5/1/2018 | 5/1/2018 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanchett- bathroom exhaust fan ok - needs 5lb flue pressure test- needs combustion opens in furnace closet 14x8 12" from bottom and 12" from top
|
Conference | 3/14/2018 | 3/16/2018 | 3/16/2018 | P | DONE |
Chad Schwendiman
|
|
|
4 pm or later if possible unless conference is just phone call, in which case any time is fine Phone #: ###-#### Inspection requested via web by Steve Hanchett - Called and discussed the venting of the bath fan and furnace
|