Final | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | PASS |
Chad Schwendiman
|
|
|
FINAL Phone #: ###-#### Inspection requested via web by Brandon Sorensen
|
Rough-in | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | PASS |
Chad Schwendiman
|
|
|
please call travis at ###-#### to meet him onsite. Phone #: ###-#### Inspection requested via web by Brandon Sorensen - Grease duct, make up air duct, hood and equipment on roof
|
Conference | 4/6/2018 | 4/9/2018 | 4/9/2018 | A | DONE |
Chad Schwendiman
|
|
|
Consult on grease duct Inspection requested via web by Brandon Sorensen - Went by and discussed grease duct installation and grease clean outs. They were planning to install a tee inplace of a 90 were the grease duct changes direction. I told them they need to use a 90 then install the tee before or avter the 90 for the grease clean outs. also discussed a location where there will be a low spot in the horizontal grease duct. I told them they will need a grease drain at that location.
|
Rough-in | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | DONE |
Chad Schwendiman
|
|
|
courtesy inspection for chase and grease duct Phone #: ###-#### Inspection requested via web by Brandon Sorensen - Conference to discuss grease duct clean outs in the shaft. I told them they would be okay with 1 clean out at the bottom of the shaft.
|