Final | 5/25/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Brian Scoles
|
|
|
Call Max if you need door code. ###-#### Inspection requested via web by Floyd Floyd Peek- final ok
|
Card not on site to sign | 5/25/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Brian Scoles
|
|
|
Call Max if you need door code. ###-#### Inspection requested via web by Floyd Floyd Peek- no card
|
Rough-in | 3/23/2018 | 3/23/2018 | 3/23/2018 | P | PART |
Bill VanDegrift
|
|
|
We will cover copper lineset 1st thing this morning. Will by done by 10:00 AM. Condensate will run to floor drain after equipment is set. Thank you, Floyd ###-#### Inspection requested via web by Floyd Floyd Peek partial ri ok walls and ceiling
|
Rough-in | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | FAIL |
Ben Livingston
|
|
|
Inspection requested via web by Floyd Floyd Peek need to protect copper pipe from galvanized sleeve in wall, no condensate run
|