Final | 5/17/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- a/c gas piping co ok
|
Final | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | CANC |
Brian Scoles
|
|
|
I have an email from Brian saying the final passed 4-30-18. So is it finaled? Phone #: ###-#### Inspection requested via web by Mary LaFayette- mary will schedule with homeowner for AC per phone call
|
Pressure Test | 5/1/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Chad Schwendiman
|
|
|
Please inspect after 2 PM. Final + gas pressure Phone #: ###-#### Inspection requested via web by Mary LaFayette - 20lb gas
|
Final | 4/30/2018 | 5/1/2018 | 5/1/2018 | P | FAIL |
Brian Scoles
|
|
|
Please inspect after 2 PM. We are doing corrections at noon. Phone #: ###-#### Inspection requested via web by Mary LaFayette- gas line didnt have pressure in it only pressured up from shut off valve behind stove to gauge
|
Pressure Test | 4/30/2018 | 5/1/2018 | 4/30/2018 | P | CANC |
Brian Scoles
|
|
|
Please inspect after 2 PM. We are doing corrections at noon. Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
Final | 4/23/2018 | 4/27/2018 | 4/27/2018 | P | FAIL |
Jack Reynolds
|
|
|
Homeowner is Tina Ison, ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- ac install pass- gas line to range needs to be isolated from live gas line with a shut off valve to open ended tee to another shut off valve. G2417.1.4 section testing
|