Final | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Chad Schwendiman
|
|
|
PROJECT MGR: ERIC ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza
|
Rough-in | 4/25/2018 | 4/25/2018 | 4/25/2018 | P | PASS |
Chad Schwendiman
|
|
|
|
Rough-in | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | FAIL |
Eric Strole
|
|
|
ERIC ALLEN ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza-Fireplace framing needs to be 45" wide and 40" high.
|