Final | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek- final ok
|
Rough-in | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | PASS |
Jack Reynolds
|
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek- R/I ok- 5lb flue pressure test on front two units ok
|
Rough-in | 5/1/2018 | 5/2/2018 | 5/2/2018 | P | NR |
Jack Reynolds
|
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek- rough in not ready yet
|
Pressure Test | 5/1/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Jack Reynolds
|
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek- 20lb gas under the floor to fireplaces ok
|
Pressure Test | 4/20/2018 | 4/23/2018 | 4/23/2018 | A | PART |
Chad Schwendiman
|
|
|
Pressure test to underground gas line - Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek - 60lb gas pass on piping from meter to west mech. rm. 20lb gas pass for piping in the overhead. 20lb gas fail for piping under floor, gauge was down to 16lbs
|