Final | 4/10/2018 | 4/10/2018 | 4/10/2018 | P | PASS |
Brian Scoles
|
|
|
Final Phone #: ###-#### Inspection requested via web by Brandon Sorensen- final ok- no card onsite to sign
|
Rough-in | 4/2/2018 | 4/3/2018 | 4/3/2018 | A | PASS |
Brian Scoles
|
|
|
cover inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- insulation on duct ok- ok to cover- ok for ceiling tiles
|
Rough-in | 3/30/2018 | 4/2/2018 | 4/2/2018 | A | PASS |
Brian Scoles
|
|
|
duct seal inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- seal on duct ok- ok to insulate- ok to cover sauffect area front entry-
|