Final | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | PASS |
Chad Schwendiman
|
|
|
|
Final | 8/3/2018 | 8/3/2018 | 8/3/2018 | P | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige - Kitchen equipment has not been installed and connected to the gas piping on the 1st floor
|
Rough-in | 5/11/2018 | 5/14/2018 | 5/14/2018 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige - 100lb hydronics pass for 2 remaining systems
|
Rough-in | 5/10/2018 | 5/11/2018 | 5/11/2018 | A | PART |
Chad Schwendiman
|
|
|
rough piping on the heat pumps Phone #: ###-#### Inspection requested via web by Nicholas Paige - 100lb hydronics pass on 2 of the 4 systems
|
Pressure Test | 3/29/2018 | 3/30/2018 | 3/30/2018 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige - 60lb gas pass for 2 lines up to the roof and 1 of the lines back down through the building to the cook lines
|