Final | 4/26/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Brian Scoles
|
|
|
grease duct final ok
|
Final | 4/2/2018 | 4/3/2018 | 4/3/2018 | A | PART |
Brian Scoles
|
|
|
Please call Rick with questions, Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- rough in on make up and exhaust duct ok- installed per manufactures instasll- need to change duct sizing on exhaust from 12" to 10" thats installed- Rick will get with engineers- drawing by captive air for routing and clean outs
|