Final | 5/13/2018 | 5/15/2018 | 5/15/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt- had ductblast onsite stickered furnace in crawl- final ok
|
Final | 5/10/2018 | 5/11/2018 | 5/11/2018 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt- no ductblast report onsite
|
Rough-in | 4/4/2018 | 4/5/2018 | 4/5/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt- R/I ok
|
Pressure Test | 4/5/2018 | 4/5/2018 | 4/5/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt- 5lb flue pass
|
Rough-in | 4/3/2018 | 4/4/2018 | 4/4/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt- need approved ACCA report onsite- didnt find one
|
Pressure Test | 4/3/2018 | 4/4/2018 | 4/4/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt- 20lb gas pass
|