Final | 6/7/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Brian Scoles
|
|
|
Mike Phone #: ###-####-please call 20 minutes prior to meet- final ok
|
Final | 6/6/2018 | 6/7/2018 | 6/7/2018 | A | FAIL |
Brian Scoles
|
|
|
please call 1/2 hr ahead to meet // Mike Phone #: ###-####- needs 2nd wet switch installed- need drip leg between shut valve and applince- need to seal OA at R/A plenum- fix register in stairwell- need airbalance and duct blast report onsite
|
Rough-in | 4/6/2018 | 4/9/2018 | 4/9/2018 | A | PASS |
Brian Scoles
|
|
|
Mike Phone #: ###-####- R/I ok
|
Rough-in | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | CANC |
Brian Scoles
|
|
|
Mike Phone #: ###-####- no access- dogs are loose in backyard to enter- need approved manual J- will reschedule later
|
Rough-in | 4/4/2018 | 4/5/2018 | 4/5/2018 | P | FAIL |
Brian Scoles
|
|
|
roofing and gas pressure test- call half hour before--Mike Phone #: ###-####- need approved ACCA report onsite and submitted to city- need to add 2 bath fans and 1 other for duct work installed to permit and pay fees-
|
Pressure Test | 4/5/2018 | 4/5/2018 | 4/5/2018 | P | PASS |
Brian Scoles
|
|
|
roofing and gas pressure test- call half hour before--Mike Phone #: ###-####- 20lb gas whole system pass- 5lb flue pass
|