Final | 6/25/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
Bill VanDegrift
|
|
|
Duct witness @ 11am. thanks Phone #: ###-#### Inspection requested via web by Gary Reeves.
|
Rough-in | 4/26/2018 | 4/26/2018 | 4/26/2018 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- clearances of 1 inch on b vent ok- duct seal ok- R/I ok
|
Pressure Test | 4/26/2018 | 4/26/2018 | 4/26/2018 | P | CANC |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves
|
Rough-in | 4/24/2018 | 4/25/2018 | 4/25/2018 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- need 1" clearance on B vent inside framing and duct work still needs sealed
|
Rough-in | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- need 1 inch clearances from furnace b vent, still need framing on b vent
|
Pressure Test | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | DONE |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- pressure test was already passed
|
Rough-in | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | FAIL |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - Need to seal metal duct, need framing around B-vent
|
Pressure Test | 4/19/2018 | 4/19/2018 | 4/19/2018 | P | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves - 20lb gas 5lb flue
|