DOC - Permit Finaled | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | PASS |
Jack Reynolds
|
|
|
final ok
|
Conference | 10/17/2018 | 10/19/2018 | 10/19/2018 | A | DONE |
Jack Reynolds
|
|
|
Tommy (conference with homeowner) Phone #: ###-#### talked with homeowner about what needs finished
|
Pressure Test | 8/16/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Jack Reynolds
|
|
|
-gas line ran from outside to shop heater location - contractor thought his first permit was finaled so he pulled another permit. I scheduled an inspection on his first permit and told him to call permit counter to get his money back on the secound permit. - 20lb gas pressure test on gas line in shop for heater ok
|
Pressure Test | 4/8/2018 | 4/9/2018 | 4/9/2018 | A | PASS |
Chad Schwendiman
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt - 20lb gas pass for unground piping
|