Final | 6/14/2018 | 6/15/2018 | 6/14/2018 | A | PASS |
Brian Scoles
|
|
|
Jamie Phone #: ###-####-around back by plywood under rock by foundation, only works for back door- final ok
|
Pressure Test | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | CANC |
Brian Scoles
|
|
|
Jamie Phone #: ###-####-around back by plywood under rock by foundation, only works for back door-
|
Rough-in | 4/18/2018 | 4/19/2018 | 4/19/2018 | A | PASS |
Brian Scoles
|
|
|
r/I and please inspect gas line connection // Jamie Phone #: ###-####- R/I ok- ok to cover- need siesmic bracing on both unit heaters- gas piping on both unit heaters needs drip leg between shut off valve and regulator by final
|
Pressure Test | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | PASS |
Brian Scoles
|
|
|
This building is located at the rear of the cemetery on Dawn road Phone #: ###-#### Inspection requested via web by Joe Taylor- 60lb pass from meter location to both unit heaters
|