Final | 6/5/2018 | 6/5/2018 | 6/5/2018 | P | PASS |
Brian Scoles
|
|
|
conference should have been final inspection
|
Conference | 4/26/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Brian Scoles
|
|
|
fireplace install and gas piping ok
|
Rough-in | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Brian Scoles
|
|
|
Call Home owner Trisha at ###-#### 30 min prior to arrival. Inspection requested via web by Ashley Stegemann- fireplace R/I ok
|
Pressure Test | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Brian Scoles
|
|
|
Call Home owner Trisha at ###-#### 30 min prior to arrival. Inspection requested via web by Ashley Stegemann- 20lb gas pass
|