Final | 9/12/2018 | 9/13/2018 | 9/13/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans- final ok
|
Final | 9/12/2018 | 9/12/2018 | 9/12/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans- lineset and gas piping need sealed at exterior of house
|
Final | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Evans- needs water heater flue connected0 missing primary and secondary drain- needs gas flexes hooked up- need to seal linset penetration exterior at condenser
|
Rough-in | 5/1/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- R/I ok
|
Pressure Test | 5/1/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pass
|
Rough-in | 4/24/2018 | 4/25/2018 | 4/25/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- b vent a roof needs 1" clearance to combustibles- left correction notice on window
|
Pressure Test | 4/24/2018 | 4/25/2018 | 4/25/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- gauge wont zero out
|