Rough-in | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Ben Livingston
|
|
|
Nathaniel Phone #: ###-####
|
Final | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Ben Livingston
|
|
|
Nathaniel Phone #: ###-####
|
Rough-in | 4/26/2018 | 4/27/2018 | 4/27/2018 | P | FAIL |
Ben Livingston
|
|
|
Will be there after 1. Thanks! Phone #: ###-#### Inspection requested via web by Nathaniel Hoffman dryer vent need to be rigid pipe all the way out of the building, flex needs to be supported to structure
|