Final | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Dianne Maxwell- final ok
|
Rough-in | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Dianne Maxwell- R/I ok
|
Rough-in | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Dianne Maxwell- need approved and stamped Man J onsite- Exhaust fans need to be finished and rough in completely- missing exhaust fan in upstairs bathroom- dryer vent need to maintain 4" size. the pipe at the top plate is being smashed
|
Pressure Test | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Dianne Maxwell- 20lb gas pressure test ok
|