Final | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PASS |
Brian Scoles
|
|
|
call for acess- Danielle Phone #: ###-####6- final ok- no gas piping was done on this permit
|
Rough-in | 8/20/2018 | 8/21/2018 | 8/21/2018 | A | PASS |
Brian Scoles
|
|
|
Eron Phone #: ###-####- R/I ok- will look at range duct on final- call in final when ready
|
Conference | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | DONE |
Brian Scoles
|
|
|
Eron Phone #: ###-####- discussed new supply duct and routing- talked about gas to a range and possible bbq- need btu ration on both- range ducge will vent directly thru wall- will call for another conference for gas piping
|