Final | 5/8/2018 | 5/8/2018 | 5/8/2018 | A | PASS |
Brian Scoles
|
|
|
hood equipment all good- airbalance good- final ok
|
Card not on site to sign | 5/8/2018 | 5/8/2018 | 5/8/2018 | A | PASS |
Brian Scoles
|
|
|
card not onsite to sign owner had it with him
|
Final | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PART |
Brian Scoles
|
|
|
Final Inspection on hood remodel Phone #: ###-#### Inspection requested via web by Randy Keuhey- kitchen appliances are not set into working position- need them set to check clearances and to final out- TEMP OCCUPANCY OK
|
Final | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | FAIL |
Brian Scoles
|
|
|
Final Inspection on Hood Remodel Phone #: ###-#### Inspection requested via web by Randy Keuhey- missing SS metal on front of hood- called Randy and let him know- airbalance on hood ok- equipment in place- just need this SS installed to final out
|
Rough-in | 5/3/2018 | 5/4/2018 | 5/4/2018 | P | PART |
Chad Schwendiman
|
|
|
Please call Randy and give a time frame. Phone #: ###-#### Inspection requested via web by Randy Keuhey - Make up air duct work okay. Holes in hood fixed, need to add a couple additional pieces of stainless steel under, and in front of hood. talked to Randy and explained to him where at. once completed and air balance report is complete schedule for final.
|