Final | 7/25/2018 | 7/25/2018 | 7/25/2018 | A | PASS |
Brian Scoles
|
|
|
final ok- card signed
|
Final | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | PART |
Brian Scoles
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- need natural gas stickers on main gas line- hook up unit heater- will final out permit when other mech contractor schedules there inspection- roof all good
|
Rough-in | 7/6/2018 | 7/6/2018 | 7/6/2018 | P | PASS |
Brian Scoles
|
|
|
JOB CONTACT - MATT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60lb gas pass whole system
|
Pressure Test | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | CANC |
Brian Scoles
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- per phone call with Matt will reschedule
|