Final | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Ben Livingston
|
|
|
please call contractor Clint when en route for final inspection Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
|
Pressure Test | 6/26/2018 | 6/27/2018 | 6/26/2018 | A | PASS |
Ben Livingston
|
|
|
Patrick Phone #: ###-#### 20 lb gas and piping
|
Rough-in | 6/1/2018 | 6/4/2018 | 6/4/2018 | A | PASS |
Ben Livingston
|
|
|
ROUGH-IN FOR 3 BATH FANS, INTAKE, ; RETURN AIR/RUNS, ETC... Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
|
Rough-in | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | FAIL |
Ben Livingston
|
|
|
PLEASE CALL CONTRACTOR CLINT @ # LISTED WHEN EN ROUTE TO ROUGH-IN INSPCTN FOR FURNACE, A/C, GAS LINES, BATH FANS, COIL, VENTING, DUCTWORK, NEW REGISTERS ; GRILLS. NEEDS PRESSURE TEST ON GAS LINES ; AIR PRESSURE TEST. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING fresh air cannot come off of the roof, crawl needs to be complete for rough in inspection
|
Pressure Test | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | PASS |
Ben Livingston
|
|
|
PLEASE CALL CONTRACTOR CLINT @ # LISTED WHEN EN ROUTE TO ROUGH-IN INSPCTN FOR FURNACE, A/C, GAS LINES, BATH FANS, COIL, VENTING, DUCTWORK, NEW REGISTERS ; GRILLS. NEEDS PRESSURE TEST ON GAS LINES ; AIR PRESSURE TEST. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING 20lb gas
|
Rough-in | 5/22/2018 | 5/24/2018 | 5/24/2018 | P | CANC |
Ben Livingston
|
|
|
ROUGH-IN & PRESSURE TEST FOR FURNACE, A/C, GAS LINE, BATHROOM FANS, DUCTWORK, LINESET, COIL, VENTING, & OTHER NEW EQUIPMENT INSTALLS. Phone #: ###-#### >> Inspection requested via web by SOPHIA FLEMING Inspection cancelled from web by: SOPHIA FLEMING
|