Final | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Brian Scoles
|
|
|
corrections have been made Phone #: ###-#### Inspection requested via web by Benny Arreola- final ok
|
Final | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Benny Arreola-need to firecaulk all penetrations in garage- single wall pipe needs 6" clearance to arma flex and flue needs grade running up hill- need sediment traps on gas line between shut off valves on gas to furnace and water heater- need to support secondary drain off coil- need to seal exterior gasline at meter, seal lineset and condensate drain exterior of building and install 3/4" pvc 90 degree outside to ground
|
Rough-in | 5/24/2018 | 5/25/2018 | 5/25/2018 | P | PASS |
Brian Scoles
|
|
|
All the corrections have been made. Phone #: ###-#### Inspection requested via web by Benny Arreola- R/I ok- corrections made
|
Rough-in | 5/21/2018 | 5/22/2018 | 5/22/2018 | A | FAIL |
Brian Scoles
|
|
|
Complete HVAC Installation and gas line Phone #: ###-#### Inspection requested via web by Benny Arreola- need approved csst nail plates and installed per manufactures installation- exhaust fans need installed and hooked up- need framing completed around duct chase 2nd floor and around gas line in garage- dryer vent needs to maintain 4" round- left correction notice front window
|
Pressure Test | 5/22/2018 | 5/22/2018 | 5/22/2018 | A | PASS |
Brian Scoles
|
|
|
Complete HVAC Installation and gas line Phone #: ###-#### Inspection requested via web by Benny Arreola- 20lb gas pass
|