Final | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by David Petsche
|
Rough-in | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PASS |
Ben Livingston
|
|
|
Inspection requested via web by David Petsche
|
Final | 5/23/2018 | 5/23/2018 | 5/23/2018 | A | PART |
Ben Livingston
|
|
|
walk arourn the back of house back door is open high and low gas pressure test pvc pressure test Phone #: ###-#### Inspection requested via web by David Petsche condenser needs to be 3' from gas meter on final
|
Pressure Test | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | PASS |
Ben Livingston
|
|
|
walk arourn the back of house back door is open high and low gas pressure test pvc pressure test Phone #: ###-#### Inspection requested via web by David Petsche 60,20lb gas 5lb flue
|