Final | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | PASS |
Jack Reynolds
|
|
|
fixed issues, should be good to go Phone #: ###-#### Inspection requested via web by Drew Tverdy- refrig line and insulations fixed and ok- final ok signed card
|
Final | 6/7/2018 | 6/7/2018 | 6/7/2018 | P | FAIL |
Brian Scoles
|
|
|
Final sign off for refrigeration install. Ultraviolet tape has been applied to line sets Phone #: ###-#### Inspection requested via web by Drew Tverdy- lineset copper is touching metal roof jack needs seperation and arma flex fixed- need to seal roof jack weather tight
|