Final | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
Ben Livingston
|
|
|
We had our electrician Robert Little of Irish electric (###-####) change out breaker you requested but he also double checked with head of Boise City permits on electrical side and he verified that he does NOT have to pull a permit to do that scope of work. I left my office phone number if any questions or concerns. If you still need to go out and verify if that breaker was changed I can coordinate with homeowner but not sure if you will need to. My name is Steve Dale and your more then welcome to ask for me if any further questions or concerns. Phone #: ###-#### Inspection requested via web by Rick Montgomery
|
Final | 6/13/2018 | 6/14/2018 | 6/14/2018 | P | FAIL |
Ben Livingston
|
|
|
please call our lead install Owen when 30 mins in route. 1-3p would work best for us if that works with your schedule Phone #: ###-#### Inspection requested via web by Rick Montgomery need to pull Electrical permit to change to 20Amp disconnect then MEC permit will pass
|
Final | 6/13/2018 | 6/14/2018 | 6/13/2018 | P | CANC |
Ben Livingston
|
|
|
PLEASE CALL OUR LEAD INSTALLER JONAH WHEN 30 MINS IN ROUTE. 2-4P WOULD WORK BEST FOR US IF THAT FITS WITHIN YOUR SCHEDULE. THANK YOU Phone #: ###-#### >> Inspection requested via web by Rick Montgomery Inspection cancelled from web by: Rick Montgomery
|