DOC - Permit Finaled | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Jack Reynolds
|
|
|
final on kitchen range hood ok
|
Mec-Aging Inspection | 3/11/2019 | 3/11/2019 | 3/11/2019 | | PASS |
Jack Reynolds
|
|
|
range is finished
|
Conference | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | DONE |
Jack Reynolds
|
|
|
need to see range hood vent installed- venting was covered up before R/I inspection was done
|
Rough-in | 6/26/2018 | 6/28/2018 | 6/28/2018 | P | NR |
Jack Reynolds
|
|
|
call 20 min advance // Joseph Phone #: ###-####- not ready hood duct not installed yet
|