Final | 7/18/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Chad Schwendiman
|
|
|
please call our lead installer Owen 30-45 mins prior so he can get the flue pressured up for you at residence. 1-3p would be preferred if at all possible. Phone #: ###-#### Inspection requested via web by Rick Montgomery
|
Final | 6/19/2018 | 6/20/2018 | 6/20/2018 | P | CANC |
Ben Livingston
|
|
|
PLEASE CALL OUR LEAD INSTALLER SAM WHEN 30 MINS IN ROUTE AND IF POSSIBLE YOUR LAST INSPECTION OF THE DAY SO WE CAN GET FLUE PRESSURED UP AND READY FOR YOU. INSTALLING 90% FURNACE IN BASEMENT AND 14 SEER AC COIL Phone #: ###-#### >> Inspection requested via web by Rick Montgomery Inspection cancelled from web by: Rick Montgomery
|