Final | 10/23/2018 | 10/23/2018 | 10/23/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown- final ok
|
Final | 10/22/2018 | 10/23/2018 | 10/23/2018 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Benny Arreola- b vent flue needs to be installed per manufactures instructions with clearances of 6 inch on water heater single wall flue
|
Final | 10/22/2018 | 10/23/2018 | 10/22/2018 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### >> Inspection requested via web by Benny Arreola Inspection cancelled from web by: Benny Arreola
|
Rough-in | 7/9/2018 | 7/10/2018 | 7/10/2018 | A | PASS |
Brian Scoles
|
|
|
Rough-In and Gas pressure test Phone #: ###-#### Inspection requested via web by Benny Arreola- R/I ok
|
Pressure Test | 7/9/2018 | 7/10/2018 | 7/10/2018 | A | PASS |
Brian Scoles
|
|
|
Rough-In and Gas pressure test Phone #: ###-#### Inspection requested via web by Benny Arreola- 20lb gas pass
|