Final | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Brian Scoles
|
|
|
Matt Phone #: ###-####- final ok- card signed
|
Final | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | PART |
Brian Scoles
|
|
|
matt benton Phone #: ###-####- need to seal tranfer duct in break room sw corner- ok for ceiling tiles remainder of rooms- recall in when complete
|
Final | 9/19/2018 | 9/20/2018 | 9/20/2018 | P | CANC |
Brian Scoles
|
|
|
Matt Phone #: ###-####- per phone call from matt- will reschedule
|
Rough-in | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | PART |
Brian Scoles
|
|
|
Matt-wrap Phone #: ###-####- seal on duct south wall to west of front entrance ok to insulate- seal on duct north wall and west ok- bathrooms need inspected when complete- existing unit heater north wall back room needs 1" clearance to combustilbe and insulation shield installed- recall in inspection when insulation on duct and bathrooms are completed
|