Final | 9/5/2018 | 9/6/2018 | 9/6/2018 | A | PASS |
Eric Strole
|
|
|
Blast witness 9:30AM Please final after Blast Thank you! Phone #: ###-#### Inspection requested via web by Randy Hart
|
Conference | 9/5/2018 | 9/6/2018 | 9/6/2018 | A | PASS |
Eric Strole
|
|
|
Blast witness 9:30AM Phone #: ###-#### Inspection requested via web by Randy Hart-Duct blast pass.
|
Conference | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | FAIL |
Eric Strole
|
|
|
Blast witness at 9:30 Spoke with Eric Phone #: ###-#### Inspection requested via web by Randy Hart-Level 1 Duct blast fail. Level 2 duct blast pass.
|
Final | 9/4/2018 | 9/5/2018 | 9/4/2018 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Hart Inspection cancelled from web by: Randy Hart
|
Pressure Test | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart-20 lb gas test pass.
|
Rough-in | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart-Cannot have a heat run in garage that is on a furnace for the living space. Fresh air to the return air plenun is not per the manual-j.
|
Pressure Test | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart-Corrections not complete.
|
Rough-in | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart-Corrections not complete.
|
Pressure Test | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart-Gas test fail.
|
Rough-in | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart-Need approved manual-j on site. Need to complete rough-in. (crawl).
|