Final | 6/5/2019 | 6/12/2019 | 6/12/2019 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt - duct blast ok - final ok
|
Mec-Aging Inspection | 5/31/2019 | 5/31/2019 | 5/31/2019 | | FAIL |
Jack Reynolds
|
|
|
Still need to see duct blast report for final. Schedule inspection if corrections have been made.
|
Final | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | FAIL |
Jack Reynolds
|
|
|
dustin Phone #: ###-#### - need duct blast docs onsite for final
|
Pressure Test | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | PASS |
Jack Reynolds
|
|
|
pm inspection please. 2:00 if possible. please call mike with any issues ###-####. thank you!! Phone #: ###-#### Inspection requested via web by Aaron Alandt- 60 lb gas pressure test under ground ok
|
Pressure Test | 10/3/2018 | 10/4/2018 | 10/4/2018 | A | FAIL |
Jack Reynolds
|
|
|
high pressure gas test for undergroung Phone #: ###-#### Inspection requested via web by Aaron Alandt- high pressure gauge was under 60 lb
|
Final | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | CANC |
Jack Reynolds
|
|
|
The man J is on site. Inspection requested via web by Aaron Alandt- this inspection should have been a R/I inspection
|
Rough-in | 7/26/2018 | 7/26/2018 | 7/26/2018 | A | PASS |
Jack Reynolds
|
|
|
The man J is on site. Inspection requested via web by Aaron Alandt- Man J is approved and ok-
|
Rough-in | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt- need an approved ManJ on the site. The ManJ also didnt match what was installed in the entertainment room.
|
Pressure Test | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt- 20lb gas pressure test ok
|