Final | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- final ok
|
Card not on site to sign | 8/30/2018 | 8/30/2018 | 8/30/2018 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- no card
|
Rough-in | 8/16/2018 | 8/17/2018 | 8/17/2018 | A | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige grid cielings ok, need labels in grid for all fire smoke dampers and all return paths cut in on final
|
Rough-in | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- seal on all duct ok- missing 1 heat pump unit - will inspect when installed- ok for floating grid
|
Rough-in | 7/9/2018 | 7/10/2018 | 7/10/2018 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- HP 9 ok to sheetrock hard lid only- partial seal on misc duct ok- recall in when all ducts installed and sealed
|